These articles might interest you

  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/06/Visuels-Actu-site-web-MAI241.gif
    📢 Diversification by the Le Havre agency 06 June 2024 News
    📢 Diversification by the Le Havre agency: Connection of a loading station SOURCE 2 arms 👨‍🔧 Our team recently completed a pipework project in Neuville-lès-Dieppe.We installed around 60 metres of 80 diameter stainless steel piping. 😊 A big thank you to the Le Havre agency for their exp...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2023/09/6.png
    SUCCESS STORY ! 04 September 2023 News
    Calibration in Congo ! In July, ALMA SERVICES realized several tank storage calibration in a terminal for one of our principal client in Congo.What’s a calibration test ? It means determinate the capacity of cylindrical tanks (vertical and horizontal) by using a measurement table that gives the ca...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group