️ Requalification mission completed!

Published on November 06, 2024 - Deliver up

Our teams successfully requalified 12 air tanks at a major player in the cement, concrete and prestressed products sector on Reunion Island.
Many thanks to our customer for his confidence and to our teams for their professionalism on this technical site.

Published on November 06, 2024 - Deliver up

These articles might interest you

  • Alma
    https://www.alma-group.com/wp-content/uploads/2025/12/alma-salon-mexique.png
    A look back at the EXPO TRANSPORTE trade show in pictures! 02 December 2025 News
    We had the pleasure of participating in the EXPO TRANSPORTE 2025 trade show, held from November 12 to 14 in Guadalajara, Mexico, alongside our local partner Petrogas Corporation. This trade show is the must-attend event for the transportation sector in Mexico. It was an opportunity to showcase our f...
    Read more
  • Deliver up
    https://www.alma-group.com/wp-content/uploads/2026/03/deliver-pay.jpg
    📢 Deliver Pay is our electronic payment solution integrated into our onboard applications. 02 March 2026 News
    ✅ A 100% seamless process for your drivers: payment is made on a single device at the time of delivery. ✅Payment is made directly on the tablet! No more payment terminals that break down or run out of battery. ✅Less equipment to manage, meaning less breakage and lower costs ✅ Fast payment an...
    Read more
  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2023/12/Mise-en-service-URV.gif
    Did you know ? 01 December 2023 News
    How does it go for a VRU deployment ❔ Once the contract is signed, products manufactured and delivered on-site, and assembly achieved, the VRU set up is made with 2 steps :– Cold commissioning : test without any product, to check materials, electronics, pneumatics, leak detection towards air...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group