Zoom on product : The Securiterre 640

Published on January 18, 2024 - Alma

Designed to prevent static accumulation and discharge during multi-sector tanker loading & unloading, this grounding unit Securiterre 640 allows you to control, ensure and maintain the grounding path during all the time of operations. This secure, intuitive and connected product presents multiple benefits such as :
– Security with its double check-point
– An easy connection with a clamp, coiled cable & cable gland (extension to 15 m)
– A binary system of the switch contact
– A unique tanker verification when connected
This product is dedicated to trucks (-barrels), rails and ships for petrochemical & chemical industries, refineries and gas terminals.
#ALMAGROUP #ALMA #SECURITERRE #PRODUCT #TRANSPOT #FLUIDS#LIQUIDS #SECURITY

Published on January 18, 2024 - Alma

These articles might interest you

  • https://www.alma-group.com/wp-content/uploads/2023/09/Visuels-Actu-site-web-AOUT.gif
    ZOOM ENTITY ! 04 September 2023
    Certification MID La directive MID (Measurement Instruments Directive), est une directive européenne qui contrôle la fabrication des instruments de mesure et notamment ceux destinés au comptage. Elle permet de certifier la précision et véracité des compteur. Cette année, le certificat d’ALM...
    Read more
  • Deliver up
    https://www.alma-group.com/wp-content/uploads/2024/07/France-Hydrogene.jpg
    SupplHy at the Grand Prix France Hydrogène 02 July 2024 News
    Last January, we presented our innovative SupplHy solution at the Hyvolution trade fair. Today, we’re proud to announce that SupplHy has been shortlisted for the Grand Prix France Hydrogène, out of 26 projects! To win the Prix Grand Public, we invite you to discover our solution and vote for...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/02/AS-Total-proxi-2_2.jpg
    A new installation ! 22 February 2024 News
    For our client Total Proxi Energies, our ALMA SERVICES teams were in charge of transforming a 3-arm Dôme loading source and calibrating them. This operation included prefabrication of the Source skid in our workshops, removal of the Dôme bridge, installation of the skid on site and electrical and...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group