Zoom on product : The Securiterre 640

Published on January 18, 2024 - Alma

Designed to prevent static accumulation and discharge during multi-sector tanker loading & unloading, this grounding unit Securiterre 640 allows you to control, ensure and maintain the grounding path during all the time of operations. This secure, intuitive and connected product presents multiple benefits such as :
– Security with its double check-point
– An easy connection with a clamp, coiled cable & cable gland (extension to 15 m)
– A binary system of the switch contact
– A unique tanker verification when connected
This product is dedicated to trucks (-barrels), rails and ships for petrochemical & chemical industries, refineries and gas terminals.
#ALMAGROUP #ALMA #SECURITERRE #PRODUCT #TRANSPOT #FLUIDS#LIQUIDS #SECURITY

Published on January 18, 2024 - Alma

These articles might interest you

  • https://www.alma-group.com/wp-content/uploads/2023/09/Visuels-Actu-site-web-AOUT.gif
    ZOOM ENTITY ! 04 September 2023
    Certification MID La directive MID (Measurement Instruments Directive), est une directive européenne qui contrôle la fabrication des instruments de mesure et notamment ceux destinés au comptage. Elle permet de certifier la précision et véracité des compteur. Cette année, le certificat d’ALM...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/06/PETROGAS-SALON.gif
    SUCCESS STORY ALMA ! 13 June 2023 News
    The Autonomous Flexicompt + a.k.a the star of the show ! On May 17th, 18th and 19th, took place the exhibition of transport and logistics suppliers held by Petrogas Corporation in Cintermex, Monterrey, Mexico. We would like to thank our Mexican partner Petrogas Corporation for having us on their boo...
    Read more
  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2023/12/Mise-en-service-URV.gif
    Did you know ? 01 December 2023 News
    How does it go for a VRU deployment ❔ Once the contract is signed, products manufactured and delivered on-site, and assembly achieved, the VRU set up is made with 2 steps :– Cold commissioning : test without any product, to check materials, electronics, pneumatics, leak detection towards air...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group