ZOOM on ALMA in Latin America !

Published on April 28, 2023 - Alma
PETROGAS and ALMA teams in Latin America during a business exhibition

ALMA continues its growth in Latin America through its partnership with PETROGAS. Our local sales engineer Paul Junior Tuta is in charge of the project, which allows ALMA Group to have a commercial presence on the continent with the users and the technical support. In addition, participation in trade fairs and prospecting on the continent enabled us to double our turnover in the first six months with headlight products such as theautonomous Flexicompt+, the Gravicompt UNI-2, the Adriane turbines and the Purgoptique.

We would like to thank PETROGAS once again for their help in settling in Monterey and for the integration into the local teams !

#alma #almagroup #mexico #petrogas #flexicomptautonomeplus #metrologielegale #gravicomptuni #purgoptique #turbineadriane

Published on April 28, 2023 - Alma

These articles might interest you

  • Deliver up
    https://www.alma-group.com/wp-content/uploads/2023/03/Sopecal.jpg
    THEY TRUST US ! 30 March 2023 News
    Sopecal Carburants has equiped its vehicle fleet with theDELIVER UP solutions.In addition to digitising all delivery documents, our mobile solution allows interconnection with ALMA GROUP Solutions&Services metering systems.It allows to manage volumetric dispensing, purging and all other product...
    Read more
  • EIB
    https://www.alma-group.com/wp-content/uploads/2023/01/EN-2-1.png
    EIB history 16 January 2023 News
    With more than 30 years of experience, EIB is a major player in Guadeloupe, Martinique and French Guiana in the field of petroleum services: installation, maintenance, periodic verification and upkeep of equipment for gas stations, independents, tankers and oil terminals. EIB also carries out leakag...
    Read more
  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group