Transformation of a loading station at the CREUTZWALD site

Published on August 02, 2024 - Alma services

We are pleased to announce the conversion of a loading station for our customer TotalEnergies at the CREUTZWALD site.
This operation includes
-Dismantling the existing equipment: gangway and Dôme loading arm
-Installing the new SOURCE arms
-Electrical wiring and commissioning of the three loading arms
This upgrade improves the efficiency and safety of loading operations.
Congratulations to our teams for their outstanding work and dedication!

Published on August 02, 2024 - Alma services

These articles might interest you

  • Luveba
    https://www.alma-group.com/wp-content/uploads/2025/01/Luveba-reno-URV.jpg
    Revamping of a VRU built end 1990’s 08 January 2025 News
    In 2023 Luveba was successful in proposing first step to new client, the basic engineering and design for revamping of a VRU : from LRVP + booster blower (and seal fluid circuit) technology to new vacuum pumps (oil and pallet type, R5 technology). It was then followed by second order, for ordering v...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2024/02/ALMA-Securiterre.jpg
    Zoom on product : The Securiterre 640 18 January 2024 News
    Designed to prevent static accumulation and discharge during multi-sector tanker loading & unloading, this grounding unit Securiterre 640 allows you to control, ensure and maintain the grounding path during all the time of operations. This secure, intuitive and connected product presents multipl...
    Read more
  • Deliver up
    Drivers trainning at GEM BARRES 01 March 2023 News
    Last week, we were training several drivers at GEM BARRES  to the use of our embedded solutions. All data received by the touch pad will go directly into the commercial management tool...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group