Transformation of a DOME loading station into a SOURCE

Published on August 02, 2024 - Alma services

We are proud to announce the conversion of a loading station for our customer TotalEnergies at the LURE site.
Our operation includes :
Removal of existing equipment: gangway and Dôme loading arm
Installation of the new SOURCE arms
Electrical wiring and commissioning of the three loading arms
This upgrade improves the efficiency and safety of loading operations.
Many thanks to our teams for their expertise and commitment!

Published on August 02, 2024 - Alma services

These articles might interest you

  • Luveba
    Maintenance of “dry” vacuum pump 16 January 2023 News
    Maintenance work on Busch equipment (dry vacuum pump) located in the Midi refinery...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/07/Elise.gif
    ALMA GROUP and the Environment 07 July 2023 News
    Since the beginning of 2022, ALMA GROUP, ALMA, ALMA SERVICES, CARBOVAC & DELIVER UP has been socially and environmentally committed through its partnership with ELISE, the waste recycling expert. This company, which employs people with disabilities or facing integration issues, welcomed us at an...
    Read more
  • Luveba
    https://www.alma-group.com/wp-content/uploads/2024/05/Luveba.jpg
    Luveba, specialist in spare parts for vapor recovery units 03 May 2024 News
    Luveba is (over 15 years) specialized on aftermarket for VRU (Vapor Recovery Unit) from all AD / AB (carbon adsorption + absorption) manufacturersCheck the Safety ; Engineer the equipment, process, instrumentation, controls ; Upgrade existing plant ; Change the vacuum technology ; Service units on s...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group