Successful rollouts in Alsace !

Published on November 06, 2024 - Deliver up

Over the past few weeks, we’ve had the pleasure of supporting the Alliance Énergies group in its logistics operations in Alsace, with installations for its various entities: Lohmuller Énergies, Schilt Energies and Ostermann Energies.

Our teams equipped their trucks to distribute fuel oil and pellets, efficiently meeting their needs. In addition to the technical installations, the group chose to integrate SMS customer notification! Thanks to the “En route” option, customers are informed in real time of their driver’s arrival, for an even smoother, more transparent experience.

A big thank you to Alliance Énergies for their trust also to Yannick KAYSER, Hervé BAUMLIN, Mathieu Grosheintz and well done to our teams for this fine regional achievement!

Published on November 06, 2024 - Deliver up

These articles might interest you

  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2024/12/Formation-Soudotec.jpg
    A quick look back at our latest ARDA training session in Abidjan ! 02 December 2024 News
    It was an opportunity to discuss on one of the major challenges facing our market : vapour recovery and its economic profitability. Two days of training on the theme of “Vapor Recovery, Emissions Reduction and Economic Profitability” with Philippe Goire, our Sales Manager at ALMA CARBOVAC. Well...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2026/02/Copie-de-mase.png
    MASE certification 03 February 2026 News
    We are pleased to announce that ALMA Services has obtained MASE version 2024 certification for a period of three years for its NORTH zone, which includes the agencies in Wormhout, Saint-Herblain, Rouen, and Le Havre. An ambitious challenge successfully completed, in a context of changes to this stan...
    Read more
  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2023/12/Mise-en-service-URV.gif
    Did you know ? 01 December 2023 News
    How does it go for a VRU deployment ❔ Once the contract is signed, products manufactured and delivered on-site, and assembly achieved, the VRU set up is made with 2 steps :– Cold commissioning : test without any product, to check materials, electronics, pneumatics, leak detection towards air...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group