Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe)

Published on January 17, 2023 - EIB

In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove.
EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system.
This work caused the closure of the station for a month.

Published on January 17, 2023 - EIB

These articles might interest you

  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2024/06/VOC.jpg
    Vapor Recovery Units 05 June 2024 News
    Over 20 years, Alma Carbovac has been continiously improving the performances of their Vapor Recovery Units (VRU) to reduce VOC emissions. ✅Our innovative technology reduces emissions and recovers liquid product, combining profitability and ecology.Our experts and R&D are at your disposal for...
    Read more
  • Deliver up
    https://www.alma-group.com/wp-content/uploads/2024/02/DU.jpg
    Digitalisation solution installation 22 February 2024 News
    A bicentenary company among our customers: it was at Streichenberger, a subsidiary of the ESLC Group, that we went to install our latest digitalization solutions.It was also an opportunity to train drivers in the use of the protocol bewteen our solutions and Alfons Haar Ltd meters...
    Read more
  • Luveba
    Maintenance of “dry” vacuum pump 16 January 2023 News
    Maintenance work on Busch equipment (dry vacuum pump) located in the Midi refinery...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group