Hybrid VRU Set up (Bordeaux)

Published on January 16, 2023 - Luveba

Set up of an hybrid VRU on the site of DPA Ambes Bordeaux France.

Published on January 16, 2023 - Luveba

These articles might interest you

  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/12/NAPEC.png
    NAPEC 01 December 2023 News
    From November 13 to 15, ALMA and ALMA SERVICES were present at the NAPEC : North Africa Energy & Hydrogen Exhibition & Conference at the Oran International Convention Center in Algeria. We were able to reaffirm our presence in Algeria with the establishment of Alma Services Algérie to provi...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/06/DEPART-FF3C.gif
    Tick tock, it’s soon the departure for our teams ! 13 June 2023 News
    Every year the French Federation of Fuels (FF3C) organizes professional meetings between partners to exchange on energy distribution. And this year it’s in Marrakech that ALMA and DELIVER UP will take this opportunity to talk about our latest products and solutions. #ALMA #DELIVERUP #ALMAGROUP #FF...
    Read more
  • Carbovac
    https://www.alma-group.com/wp-content/uploads/2023/12/Mise-en-service-URV.gif
    Did you know ? 01 December 2023 News
    How does it go for a VRU deployment ❔ Once the contract is signed, products manufactured and delivered on-site, and assembly achieved, the VRU set up is made with 2 steps :– Cold commissioning : test without any product, to check materials, electronics, pneumatics, leak detection towards air...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group