A new installation !

Published on December 04, 2023 - Deliver up

A new installation (in the cold this time) at AUVERGNE CARBURANTS, to set up our latest tablets.
It is also the chance to have a tchat with the drivers about our apps, to get their feedback and help them through the implementation of new functionnalities.
A enriching experience and a friendly time, for the drivers as for our trainers !

#digitisation #transport #training

Published on December 04, 2023 - Deliver up

These articles might interest you

  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/12/Solutrans.png
    SOLUTRANS 01 December 2023 News
    A quick look back on the SOLUTRANS week…From the 21 to 25 November, was the SOLUTRANS | Transport routier et urbain exhibition with ALMA CARBOVAC and DELIVER UP from ALMA GROUP Solutions&Services. For us it was an opportunity to meet our clients to present them our solutions and products,...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/06/Visuels-Actu-site-web-MAI241.gif
    ๐Ÿ“ข Diversification by the Le Havre agency 06 June 2024 News
    ๐Ÿ“ข Diversification by the Le Havre agency: Connection of a loading station SOURCE 2 arms ๐Ÿ‘จโ€๐Ÿ”ง Our team recently completed a pipework project in Neuville-lรจs-Dieppe.We installed around 60 metres of 80 diameter stainless steel piping. ๐Ÿ˜Š A big thank you to the Le Havre agency for their exp...
    Read more
  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group