A new installation !

Published on January 11, 2024 - Alma services

For our customer Total Proxi Energies Nord Est, our ALMA SERVICES teams installed a complete AdBlue loading and unloading source station with a 120M stainless steel tank.
The team installed the entire system, including the mechanical, electrical and automation aspects.

We would like to thank our teams for their work and our client for his trust !
#ALMASERVICES #ALMAGROUP #HYDRAULIQUE #FLUIDS #TRANSPORTS#MAINTENANCE

Published on January 11, 2024 - Alma services

These articles might interest you

  • Alma
    https://www.alma-group.com/wp-content/uploads/2024/02/ALMA-Soudotec-Senstock.jpg
    Secure your fluid transfer more than ever ! 22 February 2024 News
    As part of the drive to secure and optimise data flows, our ATLAS solution from ALMA CARBOVAC is evolving ! In Senegal, with our partner Soudotec, it has been deployed on different SENSTOCK sites to provide the Senegalese Customs central administration with loading results automatically and in real...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2026/02/PHOTO-2025-12-04-13-44-49.jpg
    Webinar Flexicompt Autonome + 03 February 2026 News
    Thank you to everyone who participated in the webinar on our Flexicompt Autonomous + Fuel Management product: From Loss to Profitability, with our Latin American sales representative, Paul Jr. Tuta. The webinar will be available online very soon so you can relive the experience. Thank you for joinin...
    Read more
  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group