A successful intervention by the EIB teams!

Published on January 08, 2025 - EIB

Our teams replaced a 10m³ tank with a perforated double wall, as well as renewing the suction, discharge and aeration systems for the entire plant, using double-envelope UPP piping for 4 tanks.

A big well done to everyone for this technical project, carried out with expertise and precision!

Published on January 08, 2025 - EIB

These articles might interest you

  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/08/NOUVELLE-INSTALLATION-LURE.jpg
    Transformation of a DOME loading station into a SOURCE 02 August 2024 News
    We are proud to announce the conversion of a loading station for our customer TotalEnergies at the LURE site.Our operation includes :Removal of existing equipment: gangway and Dôme loading armInstallation of the new SOURCE armsElectrical wiring and commissioning of the three loading armsThis upgrad...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/12/Rawabi.gif
    ALMA x RAWABI 01 December 2023 News
    The use of our Autonomous Flexicompt+ is increasing in Saudi Arabia!Thanks to the promotional work of our official distributor Rawabi Holding Group OIL & GAS, more and more players in the oil & gas sector in Saudi Arabia are adopting the use of the Flexicompt+, this is particularly the case...
    Read more
  • Alma
    What’s new with Atlas Neo ? What’s new with Atlas Neo ? 01 March 2023 News
    #supervision #atlasneo #alma #almagroup...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group