Transformation of a DOME loading station into a SOURCE

Published on August 02, 2024 - Alma services

We are proud to announce the conversion of a loading station for our customer TotalEnergies at the LURE site.
Our operation includes :
Removal of existing equipment: gangway and Dôme loading arm
Installation of the new SOURCE arms
Electrical wiring and commissioning of the three loading arms
This upgrade improves the efficiency and safety of loading operations.
Many thanks to our teams for their expertise and commitment!

Published on August 02, 2024 - Alma services

These articles might interest you

  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/10/Citerne-calorifugee.jpg
    New successful achievement! 02 October 2024 News
    The Le Havre agency worked on a heat-insulated tank for one of our customers in the North of France.The work involved– Removal of the lagging– inspection– Installation of new lagging– Painting by our subcontractorTake a look at the before-and-after photos!Well done to our tea...
    Read more
  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
  • EMIMA
    https://www.alma-group.com/wp-content/uploads/2023/04/Initiative-0-papier.png
    FOCUS RSE ! 28 April 2023 News
    Heading to Mauritius for new initiatives ! In conjunction with ALMA GROUP‘s CSR approach, EMIMA has added specific actions for the management of its CSR policy: Initiative number 1: 0 paper. Based on increased digitalisation, paper has been gradually eliminated from Riche Terre’s premise...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group